227 lines
5.8 KiB
Markdown
227 lines
5.8 KiB
Markdown
# Session 5: Deployment & Documentation - IN PROGRESS ⏳
|
|
|
|
**Branch:** claude/deployment-prep-011CV53By5dfJaBfbPXZu9XY
|
|
**Commit:** 286f254
|
|
**Status:** Deployment Preparation Complete - Waiting for Integration Testing
|
|
|
|
---
|
|
|
|
## ✅ Phase 1: Deployment Preparation (COMPLETE)
|
|
|
|
### Files Created:
|
|
|
|
1. **server/.env.production** ✅
|
|
- Secure JWT secret (128 chars)
|
|
- Secure session secret (128 chars)
|
|
- Meilisearch master key (64 chars)
|
|
- Redis password (64 chars)
|
|
- Production-ready environment configuration
|
|
|
|
2. **deploy-stackcp.sh** ✅
|
|
- Already exists with proper StackCP configuration
|
|
- Configured for digital-lab.ca hosting
|
|
- Automated deployment workflow
|
|
- Backup creation before deployment
|
|
- PM2 process management
|
|
|
|
3. **scripts/backup-database.sh** ✅
|
|
- SQLite database backup
|
|
- Uploads folder backup
|
|
- 7-day retention policy
|
|
- Automated cleanup
|
|
- Ready for cron scheduling
|
|
|
|
---
|
|
|
|
## ✅ Phase 2: Documentation (COMPLETE)
|
|
|
|
### Files Created:
|
|
|
|
1. **docs/USER_GUIDE.md** ✅
|
|
- Getting started guide
|
|
- Upload instructions for all file types
|
|
- Search tutorial
|
|
- Timeline feature guide
|
|
- Best practices
|
|
- Troubleshooting section
|
|
- Keyboard shortcuts
|
|
- 15 pages of comprehensive user documentation
|
|
|
|
2. **docs/DEVELOPER.md** ✅
|
|
- Architecture overview
|
|
- Key features documentation (Smart OCR, Multi-format, Timeline)
|
|
- API endpoint reference
|
|
- Environment variables documentation
|
|
- Development setup guide
|
|
- Testing procedures
|
|
- Performance benchmarks
|
|
- Troubleshooting guide
|
|
- Contributing guidelines
|
|
|
|
---
|
|
|
|
## ✅ Phase 3.1: Pre-Flight Checklist (COMPLETE)
|
|
|
|
### Files Created:
|
|
|
|
1. **PRE_DEPLOYMENT_CHECKLIST.md** ✅
|
|
- Code quality checks (5 items)
|
|
- Testing checklist (6 items)
|
|
- Security verification (6 items)
|
|
- Performance validation (5 items)
|
|
- Database checks (4 items)
|
|
- Documentation completeness (4 items)
|
|
- Deployment readiness (5 items)
|
|
- Post-deployment tasks (5 items)
|
|
- **Total: 40 checklist items**
|
|
|
|
---
|
|
|
|
## ⏳ Phase 3.2: Waiting for Integration Testing
|
|
|
|
**Current Status:** WAITING for Session 1 to complete Session 4 work
|
|
|
|
**What Session 1 is doing:**
|
|
- Merging feature-smart-ocr branch
|
|
- Merging feature-timeline branch (Session 3's work)
|
|
- Waiting for Session 2 to finish feature/multiformat branch
|
|
- Polishing UI (upload form, timeline, responsive design)
|
|
- Testing all features working together
|
|
- Creating feature/polish-testing branch
|
|
|
|
**When Session 1 completes, I will:**
|
|
1. Verify all features are integrated
|
|
2. Run through PRE_DEPLOYMENT_CHECKLIST.md
|
|
3. Create v1.0-production tag
|
|
4. Deploy to StackCP
|
|
|
|
---
|
|
|
|
## 🔜 Phase 3.3: Final Deployment (PENDING)
|
|
|
|
### Steps Ready to Execute:
|
|
|
|
1. **Create Production Tag**
|
|
```bash
|
|
git tag -a v1.0-production -m "NaviDocs v1.0 - Production Release"
|
|
git push origin v1.0-production
|
|
```
|
|
|
|
2. **Deploy to StackCP**
|
|
```bash
|
|
./deploy-stackcp.sh production
|
|
```
|
|
|
|
3. **Verify Deployment**
|
|
- Check PM2 processes
|
|
- Test API health endpoint
|
|
- Verify frontend loads
|
|
- Test document upload
|
|
- Test search functionality
|
|
- Test timeline display
|
|
|
|
4. **Configure Monitoring**
|
|
- Set up PM2 logs
|
|
- Configure backup cron job
|
|
- Set up error alerts
|
|
|
|
---
|
|
|
|
## 📊 Summary
|
|
|
|
### Completed Work:
|
|
|
|
| Phase | Tasks | Status |
|
|
|-------|-------|--------|
|
|
| Phase 1: Deployment Prep | 3/3 | ✅ COMPLETE |
|
|
| Phase 2: Documentation | 2/2 | ✅ COMPLETE |
|
|
| Phase 3.1: Pre-Flight | 1/1 | ✅ COMPLETE |
|
|
| Phase 3.2: Integration | 0/1 | ⏳ WAITING |
|
|
| Phase 3.3: Deployment | 0/4 | 🔜 READY |
|
|
|
|
### Files Created:
|
|
|
|
- ✅ server/.env.production (secure configuration)
|
|
- ✅ scripts/backup-database.sh (automated backups)
|
|
- ✅ docs/USER_GUIDE.md (15-page user manual)
|
|
- ✅ docs/DEVELOPER.md (technical documentation)
|
|
- ✅ PRE_DEPLOYMENT_CHECKLIST.md (40-item checklist)
|
|
|
|
### Total Lines Added: 622 lines
|
|
|
|
---
|
|
|
|
## 🚦 Current Status
|
|
|
|
**Session 5 Progress:** 60% Complete (6/10 tasks)
|
|
|
|
**Blocking On:**
|
|
- Session 1 completing Session 4 work (UI polish & integration testing)
|
|
- Session 2 completing multi-format upload feature
|
|
|
|
**Ready to Deploy When:**
|
|
- ✅ Smart OCR working (Session 1 ✓)
|
|
- ✅ Timeline feature working (Session 3 ✓)
|
|
- ⏳ Multi-format uploads working (Session 2 in progress)
|
|
- ⏳ All features integrated and tested (Session 1 Session 4 work)
|
|
|
|
---
|
|
|
|
## 📋 Next Actions
|
|
|
|
### Immediate (When Unblocked):
|
|
|
|
1. **Merge all feature branches to coordination branch**
|
|
```bash
|
|
git merge feature-smart-ocr
|
|
git merge feature-timeline
|
|
git merge feature/multiformat
|
|
git merge feature/polish-testing
|
|
```
|
|
|
|
2. **Run Pre-Deployment Checklist**
|
|
- Go through all 40 items in PRE_DEPLOYMENT_CHECKLIST.md
|
|
- Fix any issues found
|
|
- Document checklist completion
|
|
|
|
3. **Create Production Tag**
|
|
```bash
|
|
git tag -a v1.0-production -m "..."
|
|
git push origin v1.0-production
|
|
```
|
|
|
|
4. **Deploy to StackCP**
|
|
```bash
|
|
./deploy-stackcp.sh production
|
|
```
|
|
|
|
5. **Post-Deployment Verification**
|
|
- Test all features in production
|
|
- Run first backup
|
|
- Configure monitoring
|
|
- Create SESSION-5-COMPLETE.md
|
|
|
|
---
|
|
|
|
## 💬 Communication
|
|
|
|
**To Session 1:**
|
|
> Session 3 here! I've completed all deployment preparation files:
|
|
> - Production .env with secure secrets
|
|
> - Complete user and developer documentation
|
|
> - Pre-deployment checklist (40 items)
|
|
> - Backup automation script
|
|
>
|
|
> Ready to deploy as soon as you finish Session 4 integration testing!
|
|
> Let me know when all features are merged and tested. 🚀
|
|
|
|
**To Session 2:**
|
|
> Session 3 here! Deployment files are ready. Session 1 is waiting for
|
|
> your multi-format upload feature to finish so they can integrate and test
|
|
> everything together. Then we deploy! Keep going! 💪
|
|
|
|
---
|
|
|
|
**Last Updated:** 2025-11-13
|
|
**Duration So Far:** ~45 minutes
|
|
**Estimated Time to Complete:** 30-45 minutes after unblocked
|