navidocs/S2_MISSION_3_INTEGRATION_SWARM.md
Danny Stocker 96d1c7bcb8 Add S² development plan: 4 missions, 30 agents, complete NaviDocs feature roadmap
Created comprehensive S² multi-agent swarm development plan integrating with
ongoing InfraFabric S² API expansion.

Mission Files:
- S2_MISSION_1_BACKEND_SWARM.md: 10 Haiku agents for backend APIs (50+ endpoints, 29 tables)
- S2_MISSION_2_FRONTEND_SWARM.md: 10 Haiku agents for owner dashboard (8 modules)
- S2_MISSION_3_INTEGRATION_SWARM.md: 10 Haiku agents for testing/deployment
- S2_MISSION_4_SONNET_PLANNER.md: 1 Sonnet coordinator for all swarms
- NAVIDOCS_S2_DEVELOPMENT_ROADMAP.md: Complete roadmap with all intelligence dossier features

Features Covered (11 core modules):
1. Camera Monitoring - Live RTSP/ONVIF feeds, motion detection
2. Inventory Tracking - Photo catalog, €15K-€50K value recovery
3. Maintenance Log - Service history, provider ratings
4. Multi-Calendar - Service, warranty, onboard, work roadmap
5. Expense Tracking - Receipt OCR, multi-user splitting
6. Contact Directory - One-tap call, WhatsApp integration
7. Warranty Dashboard - Expiration countdown, alerts
8. VAT/Tax Compliance - EU exit log, 18-month timer
9. Intelligent Search - Faceted results (NO long lists)
10. WhatsApp Notifications - 5 notification types
11. Document Versioning - SHA-256 hashes, IF.TTT compliance

Integration with InfraFabric S²:
- Shared MCP bridge for agent coordination
- IF.TTT standards applied (same as bridge patches)
- Reuses swarm patterns from InfraFabric
- 4-session sequential execution

Budget & Timeline:
- 31 agents total (30 Haiku + 1 Sonnet)
- $12-$18 total cost (vs $90 original sessions)
- 16-22 hours development time
- Target launch: December 10, 2025

Status:  READY TO LAUNCH

Citation: if://roadmap/navidocs-s2-development-2025-11-14

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-11-14 09:11:33 +01:00

120 lines
3.9 KiB
Markdown

# S² Mission 3: Integration & Testing Swarm
**Session ID:** NAVIDOCS-S2-INTEGRATION
**Swarm Size:** 10 Haiku agents
**Coordinator:** S2-PLANNER (Sonnet)
**Estimated Duration:** 4-6 hours
**Dependencies:** Missions 1 & 2 must complete first
---
## 🎯 Mission Objective
End-to-end integration testing, performance optimization, and production deployment preparation.
---
## 👥 Agent Assignments
### Agent I-01: E2E Test Suite (Playwright)
**Task:** Complete user journey testing
- Login → Camera check → Add expense → View calendar flow
- Invoice upload → OCR → Expense categorization flow
- Equipment add → Photo upload → Depreciation calculation flow
- Target: 90%+ critical path coverage
### Agent I-02: Performance Optimization
**Task:** Frontend performance tuning
- Lazy loading components
- Image optimization (WebP format, responsive images)
- Bundle size reduction (<500KB target)
- Lighthouse score >90
### Agent I-03: Mobile Responsiveness Testing
**Task:** Test on 5+ device sizes
- iPhone SE (375px), iPhone 12 (390px), iPad (768px), Desktop (1920px)
- Touch gestures (swipe, pinch-to-zoom on camera feeds)
- Hamburger menu navigation
- Form inputs (ensure 48px min height for mobile)
### Agent I-04: Accessibility Audit
**Task:** WCAG 2.1 AA compliance
- Screen reader testing (NVDA, JAWS)
- Keyboard navigation (all features accessible via keyboard)
- Color contrast verification (4.5:1 minimum)
- ARIA labels on all interactive elements
### Agent I-05: Offline Mode Testing
**Task:** Service worker + offline functionality
- Cache critical assets (dashboard, inventory, contacts)
- Queue API requests when offline (sync when online)
- Offline indicator UI (banner "You are offline")
- Test: Turn off Wi-Fi, verify app still usable
### Agent I-06: Security Testing
**Task:** Penetration testing + vulnerability scan
- SQL injection attempts (all API endpoints)
- XSS attempts (user inputs)
- CSRF protection (verify tokens)
- Rate limiting (test 1000 req/min, should block)
- Multi-tenant isolation (ensure no data leakage)
### Agent I-07: WhatsApp Integration Testing
**Task:** End-to-end WhatsApp flow
- Send test notifications (warranty, service, expense, camera)
- Verify delivery status tracking
- Test opt-out flow (GDPR)
- Verify rate limiting (max 10 messages/hour per user)
### Agent I-08: Home Assistant Camera Integration
**Task:** Real camera hardware testing
- Test with 3+ camera types (Reolink, Hikvision, generic ONVIF)
- RTSP stream stability (24-hour test)
- Motion detection webhooks
- Snapshot quality (1080p minimum)
### Agent I-09: Data Migration & Seeding
**Task:** Production data preparation
- Seed script for demo accounts (Riviera Plaisance pilot)
- Migration from existing NaviDocs users (if any)
- Sample data: 3 boats, 50+ documents, 20+ equipment items
- Backup/restore procedures
### Agent I-10: Deployment & Monitoring Setup
**Task:** Production deployment
- Docker Compose configuration
- Environment variables documentation
- Monitoring dashboards (Grafana + Prometheus)
- Error tracking (Sentry integration)
- Backup automation (daily database dumps)
---
## 📊 Success Metrics
- [ ] 90%+ E2E test coverage (critical paths)
- [ ] Lighthouse score >90 (performance, accessibility, SEO)
- [ ] Zero critical security vulnerabilities (OWASP Top 10)
- [ ] <3s page load time (on 3G connection)
- [ ] 100% mobile responsiveness (5+ device sizes tested)
- [ ] Service worker caching 100% critical assets
- [ ] Monitoring dashboards operational (uptime, errors, latency)
---
## 🚀 Launch Command
```bash
# Deploy to staging environment
# Run full test suite (unit + integration + E2E)
# Performance audit (Lighthouse CI)
# Security scan (OWASP ZAP)
# Final approval from S2-PLANNER
```
**Estimated Cost:** ~$2-$3 (600K Haiku tokens)
**Estimated Time:** 4-6 hours
---
**Generated:** 2025-11-14
**Citation:** if://mission/navidocs-s2-integration-swarm-2025-11-14