navidocs/PRE_DEPLOYMENT_CHECKLIST.md
Claude 286f254551
[SESSION-5] Add deployment preparation files
Phase 1: Deployment Preparation
- server/.env.production: Production environment with secure secrets
- scripts/backup-database.sh: Automated daily backup script
- deploy-stackcp.sh: Already exists with proper StackCP config

Phase 2: Documentation
- docs/USER_GUIDE.md: Complete user manual (15 pages)
- docs/DEVELOPER.md: Technical documentation with API reference

Phase 3: Pre-Flight
- PRE_DEPLOYMENT_CHECKLIST.md: 27-item deployment checklist

All deployment files ready. Waiting for Session 1 to complete
Session 4 work (integration testing) before final deployment.

Next steps:
1. Wait for Session 1 integration testing complete
2. Create v1.0-production tag
3. Deploy to StackCP with ./deploy-stackcp.sh
2025-11-13 12:58:30 +00:00

1.5 KiB

Pre-Deployment Checklist

Run before deploying to production:

Code Quality

  • All feature branches merged to main
  • No console.log() in production code
  • No TODO/FIXME comments
  • Code formatted consistently
  • No unused imports

Testing

  • All API endpoints tested manually
  • Upload flow works for all file types
  • Search returns accurate results
  • Timeline loads and paginates correctly
  • Mobile responsive on 3 screen sizes
  • No browser console errors

Security

  • JWT secrets are 64+ characters
  • .env.production created with unique secrets
  • No hardcoded credentials
  • File upload size limits enforced
  • SQL injection prevention verified
  • XSS prevention verified

Performance

  • Smart OCR working (<10s for text PDFs)
  • Search response time <50ms
  • Frontend build size <2MB
  • Images optimized
  • No memory leaks

Database

  • All migrations run successfully
  • Indexes created on activity_log
  • Foreign keys configured
  • Backup script tested

Documentation

  • USER_GUIDE.md complete
  • DEVELOPER.md complete
  • API documented
  • Environment variables documented

Deployment

  • deploy-stackcp.sh configured with correct host
  • SSH access to StackCP verified
  • PM2 configuration ready
  • Backup strategy defined
  • Rollback plan documented

Post-Deployment

  • SSL certificate installed
  • Domain DNS configured
  • Monitoring alerts configured
  • First backup completed
  • Version tagged in git