Created comprehensive S² multi-agent swarm development plan integrating with ongoing InfraFabric S² API expansion. Mission Files: - S2_MISSION_1_BACKEND_SWARM.md: 10 Haiku agents for backend APIs (50+ endpoints, 29 tables) - S2_MISSION_2_FRONTEND_SWARM.md: 10 Haiku agents for owner dashboard (8 modules) - S2_MISSION_3_INTEGRATION_SWARM.md: 10 Haiku agents for testing/deployment - S2_MISSION_4_SONNET_PLANNER.md: 1 Sonnet coordinator for all swarms - NAVIDOCS_S2_DEVELOPMENT_ROADMAP.md: Complete roadmap with all intelligence dossier features Features Covered (11 core modules): 1. Camera Monitoring - Live RTSP/ONVIF feeds, motion detection 2. Inventory Tracking - Photo catalog, €15K-€50K value recovery 3. Maintenance Log - Service history, provider ratings 4. Multi-Calendar - Service, warranty, onboard, work roadmap 5. Expense Tracking - Receipt OCR, multi-user splitting 6. Contact Directory - One-tap call, WhatsApp integration 7. Warranty Dashboard - Expiration countdown, alerts 8. VAT/Tax Compliance - EU exit log, 18-month timer 9. Intelligent Search - Faceted results (NO long lists) 10. WhatsApp Notifications - 5 notification types 11. Document Versioning - SHA-256 hashes, IF.TTT compliance Integration with InfraFabric S²: - Shared MCP bridge for agent coordination - IF.TTT standards applied (same as bridge patches) - Reuses swarm patterns from InfraFabric - 4-session sequential execution Budget & Timeline: - 31 agents total (30 Haiku + 1 Sonnet) - $12-$18 total cost (vs $90 original sessions) - 16-22 hours development time - Target launch: December 10, 2025 Status: ✅ READY TO LAUNCH Citation: if://roadmap/navidocs-s2-development-2025-11-14 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude <noreply@anthropic.com>
3.9 KiB
S² Mission 3: Integration & Testing Swarm
Session ID: NAVIDOCS-S2-INTEGRATION Swarm Size: 10 Haiku agents Coordinator: S2-PLANNER (Sonnet) Estimated Duration: 4-6 hours Dependencies: Missions 1 & 2 must complete first
🎯 Mission Objective
End-to-end integration testing, performance optimization, and production deployment preparation.
👥 Agent Assignments
Agent I-01: E2E Test Suite (Playwright)
Task: Complete user journey testing
- Login → Camera check → Add expense → View calendar flow
- Invoice upload → OCR → Expense categorization flow
- Equipment add → Photo upload → Depreciation calculation flow
- Target: 90%+ critical path coverage
Agent I-02: Performance Optimization
Task: Frontend performance tuning
- Lazy loading components
- Image optimization (WebP format, responsive images)
- Bundle size reduction (<500KB target)
- Lighthouse score >90
Agent I-03: Mobile Responsiveness Testing
Task: Test on 5+ device sizes
- iPhone SE (375px), iPhone 12 (390px), iPad (768px), Desktop (1920px)
- Touch gestures (swipe, pinch-to-zoom on camera feeds)
- Hamburger menu navigation
- Form inputs (ensure 48px min height for mobile)
Agent I-04: Accessibility Audit
Task: WCAG 2.1 AA compliance
- Screen reader testing (NVDA, JAWS)
- Keyboard navigation (all features accessible via keyboard)
- Color contrast verification (4.5:1 minimum)
- ARIA labels on all interactive elements
Agent I-05: Offline Mode Testing
Task: Service worker + offline functionality
- Cache critical assets (dashboard, inventory, contacts)
- Queue API requests when offline (sync when online)
- Offline indicator UI (banner "You are offline")
- Test: Turn off Wi-Fi, verify app still usable
Agent I-06: Security Testing
Task: Penetration testing + vulnerability scan
- SQL injection attempts (all API endpoints)
- XSS attempts (user inputs)
- CSRF protection (verify tokens)
- Rate limiting (test 1000 req/min, should block)
- Multi-tenant isolation (ensure no data leakage)
Agent I-07: WhatsApp Integration Testing
Task: End-to-end WhatsApp flow
- Send test notifications (warranty, service, expense, camera)
- Verify delivery status tracking
- Test opt-out flow (GDPR)
- Verify rate limiting (max 10 messages/hour per user)
Agent I-08: Home Assistant Camera Integration
Task: Real camera hardware testing
- Test with 3+ camera types (Reolink, Hikvision, generic ONVIF)
- RTSP stream stability (24-hour test)
- Motion detection webhooks
- Snapshot quality (1080p minimum)
Agent I-09: Data Migration & Seeding
Task: Production data preparation
- Seed script for demo accounts (Riviera Plaisance pilot)
- Migration from existing NaviDocs users (if any)
- Sample data: 3 boats, 50+ documents, 20+ equipment items
- Backup/restore procedures
Agent I-10: Deployment & Monitoring Setup
Task: Production deployment
- Docker Compose configuration
- Environment variables documentation
- Monitoring dashboards (Grafana + Prometheus)
- Error tracking (Sentry integration)
- Backup automation (daily database dumps)
📊 Success Metrics
- 90%+ E2E test coverage (critical paths)
- Lighthouse score >90 (performance, accessibility, SEO)
- Zero critical security vulnerabilities (OWASP Top 10)
- <3s page load time (on 3G connection)
- 100% mobile responsiveness (5+ device sizes tested)
- Service worker caching 100% critical assets
- Monitoring dashboards operational (uptime, errors, latency)
🚀 Launch Command
# Deploy to staging environment
# Run full test suite (unit + integration + E2E)
# Performance audit (Lighthouse CI)
# Security scan (OWASP ZAP)
# Final approval from S2-PLANNER
Estimated Cost: ~$2-$3 (600K Haiku tokens) Estimated Time: 4-6 hours
Generated: 2025-11-14 Citation: if://mission/navidocs-s2-integration-swarm-2025-11-14