navidocs/NAVIDOCS_S2_DEVELOPMENT_ROADMAP.md
Danny Stocker 96d1c7bcb8 Add S² development plan: 4 missions, 30 agents, complete NaviDocs feature roadmap
Created comprehensive S² multi-agent swarm development plan integrating with
ongoing InfraFabric S² API expansion.

Mission Files:
- S2_MISSION_1_BACKEND_SWARM.md: 10 Haiku agents for backend APIs (50+ endpoints, 29 tables)
- S2_MISSION_2_FRONTEND_SWARM.md: 10 Haiku agents for owner dashboard (8 modules)
- S2_MISSION_3_INTEGRATION_SWARM.md: 10 Haiku agents for testing/deployment
- S2_MISSION_4_SONNET_PLANNER.md: 1 Sonnet coordinator for all swarms
- NAVIDOCS_S2_DEVELOPMENT_ROADMAP.md: Complete roadmap with all intelligence dossier features

Features Covered (11 core modules):
1. Camera Monitoring - Live RTSP/ONVIF feeds, motion detection
2. Inventory Tracking - Photo catalog, €15K-€50K value recovery
3. Maintenance Log - Service history, provider ratings
4. Multi-Calendar - Service, warranty, onboard, work roadmap
5. Expense Tracking - Receipt OCR, multi-user splitting
6. Contact Directory - One-tap call, WhatsApp integration
7. Warranty Dashboard - Expiration countdown, alerts
8. VAT/Tax Compliance - EU exit log, 18-month timer
9. Intelligent Search - Faceted results (NO long lists)
10. WhatsApp Notifications - 5 notification types
11. Document Versioning - SHA-256 hashes, IF.TTT compliance

Integration with InfraFabric S²:
- Shared MCP bridge for agent coordination
- IF.TTT standards applied (same as bridge patches)
- Reuses swarm patterns from InfraFabric
- 4-session sequential execution

Budget & Timeline:
- 31 agents total (30 Haiku + 1 Sonnet)
- $12-$18 total cost (vs $90 original sessions)
- 16-22 hours development time
- Target launch: December 10, 2025

Status:  READY TO LAUNCH

Citation: if://roadmap/navidocs-s2-development-2025-11-14

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-11-14 09:11:33 +01:00

16 KiB

NaviDocs S² Development Roadmap

Generated: 2025-11-14 Integration: InfraFabric S² API expansion (ongoing) Timeline: 4 sessions, 30 agents (Haiku) + 1 planner (Sonnet) Estimated Duration: 16-22 hours total Budget: $12-$18 total


🎯 Executive Summary

This roadmap implements ALL features from NaviDocs intelligence dossiers (Sessions 1-5) using InfraFabric S² multi-agent swarm coordination patterns. Owner dashboard will include 8 core modules solving the €15K-€50K inventory loss problem that ZERO competitors address.

Key Innovation: Philosophy-embodied-in-code pattern validated on MCP bridge (92% compliance) applied to NaviDocs development for traceable, transparent, trustworthy delivery.


📋 Complete Feature List (from Intelligence Dossiers)

Owner Dashboard Features

1. Camera Monitoring 🎥

  • Live RTSP/ONVIF camera feeds (Home Assistant integration)
  • Daily automatic snapshots
  • Motion detection alerts (WebSocket real-time)
  • Snapshot history gallery (last 30 days)
  • Share via WhatsApp
  • Pain Solved: 80% remote monitoring anxiety

2. Inventory Tracking 📦

  • Photo-based equipment catalog
  • Depreciation calculator (straight-line method)
  • Total inventory value tracking
  • €15K-€50K resale value recovery metric
  • Category filtering (electronics, safety, comfort)
  • Pain Solved: €15K-€50K inventory loss at resale

3. Maintenance Log 🔧

  • Service history timeline
  • Service reminders (hours/months-based)
  • Provider ratings (1-5 stars)
  • Export to PDF
  • Pain Solved: €5K-€100K/year maintenance chaos

4. Multi-Calendar System 📅

  • Service Calendar (past/future maintenance)
  • Warranty Calendar (expiration dates with color coding)
  • Onboard Calendar (owner's time on boat)
  • Work Roadmap Calendar (maintenance plan)
  • iCal export
  • Pain Solved: Forgotten services, warranty penalties

5. Expense Tracking 💰

  • Receipt OCR (extract date, amount, vendor)
  • Multi-user expense splitting (Spliit fork)
  • Monthly/annual spend charts
  • Budget alerts (>80% of budget)
  • Export to CSV for tax
  • Pain Solved: €60K-€100K/year expense tracking nightmare

6. Contact Directory 📞

  • Marina, mechanics, vendors database
  • One-tap call button
  • WhatsApp message integration
  • Star ratings per provider
  • Nearby provider suggestions (GPS-based)
  • Pain Solved: Finding reliable service providers

7. Warranty Dashboard ⚠️

  • Equipment warranty tracker
  • Expiration countdown (days remaining)
  • Color coding (green >90 days, yellow 30-90, red <30)
  • WhatsApp/email alerts (30/60/90 days before)
  • Pain Solved: €1K-€10K warranty penalties from missed deadlines

8. VAT/Tax Compliance 🇪🇺

  • EU exit log (GPS-tracked)
  • 18-month countdown timer
  • Customs stamp upload (OCR extraction)
  • Compliance report PDF
  • €20K-€100K penalty avoidance
  • Pain Solved: 30% of EU yachts at risk of VAT violations

9. Intelligent Search 🔍

  • Global search (documents, equipment, contacts, maintenance)
  • Autocomplete suggestions
  • Faceted results (organized by category, NO long lists)
  • Meilisearch integration
  • Pain Solved: Finding anything in boat documentation chaos

10. WhatsApp Notifications 📱

  • Warranty expiration alerts
  • Service reminders
  • Monthly spend summary
  • Motion detection (camera)
  • VAT compliance reminders
  • Pain Solved: Missing critical deadlines

11. Document Versioning 📄

  • Version history (SHA-256 hashes)
  • Compare versions (diff view)
  • Restore old versions
  • Conflict resolution
  • Pain Solved: Lost/overwritten documents

Additional Features (Nice-to-Have)

12. Offline Mode ✈️

  • Service workers cache critical data
  • Queue API requests when offline
  • Sync when back online
  • Use Case: No Wi-Fi at marina, still access docs

13. Accessibility

  • WCAG 2.1 AA compliance
  • Screen reader support
  • Keyboard shortcuts (Ctrl+1-8 navigate modules)
  • High contrast mode
  • Use Case: Owners with disabilities

14. Multi-Language 🌍

  • English, French, Spanish, Italian (European market)
  • RTL support (for potential Middle East expansion)
  • Use Case: International yacht owners

🗓️ 4-Session S² Development Plan

Mission 1: Backend Development Swarm

Duration: 6-8 hours Agents: 10 Haiku Budget: $3-$5

Deliverables:

  • 50+ API endpoints (RESTful + WebSocket)
  • 29 database tables (migrations + indexes)
  • Multi-tenant isolation enforced
  • IF.TTT audit trails (all data mutations)
  • Business logic: Inventory, Maintenance, Cameras, Expenses, Contacts, Search, WhatsApp, VAT

Agent Assignments:

  • B-01: Database Migrations (MUST complete first)
  • B-02: Inventory Tracking API
  • B-03: Maintenance Log & Calendar API
  • B-04: Camera Integration API (Home Assistant)
  • B-05: Contact Management API
  • B-06: Expense Tracking & Accounting API
  • B-07: Search Infrastructure (Meilisearch)
  • B-08: WhatsApp Integration API
  • B-09: Document Versioning API
  • B-10: VAT/Tax Tracking API

Success Criteria:

  • All APIs testable via Postman/curl
  • OpenAPI 3.0 specification complete
  • Unit + integration tests passing
  • Multi-tenant isolation verified

Mission 2: Frontend/UX Development Swarm

Duration: 6-8 hours Agents: 10 Haiku Budget: $3-$5 Dependencies: Mission 1 MUST complete first

Deliverables:

  • Owner Dashboard (8 feature modules)
  • Session 3 design system implemented (Ocean Deep, Wave Blue, Sand Beige)
  • Mobile-first responsive (80% of users on mobile)
  • Keyboard shortcuts + accessibility
  • Storybook component showcase

Agent Assignments:

  • F-01: Dashboard Layout & Navigation
  • F-02: Camera Monitoring Interface
  • F-03: Inventory Tracking Interface
  • F-04: Maintenance Log & Multi-Calendar
  • F-05: Expense Tracking Interface (OCR)
  • F-06: Contact Directory Interface
  • F-07: Search UX (faceted results, NO long lists)
  • F-08: Warranty Expiration Dashboard
  • F-09: WhatsApp Notification Settings
  • F-10: VAT/Tax Compliance Interface

Success Criteria:

  • All 8 dashboard modules functional
  • Design system 100% compliant
  • Lighthouse score >90
  • WCAG 2.1 AA compliance

Mission 3: Integration & Testing Swarm

Duration: 4-6 hours Agents: 10 Haiku Budget: $2-$3 Dependencies: Missions 1 & 2 MUST complete first

Deliverables:

  • E2E test suite (Playwright)
  • Performance optimization (lazy loading, caching)
  • Mobile responsiveness verified (5+ devices)
  • Accessibility audit (screen readers, keyboard nav)
  • Offline mode functional (service workers)
  • Security audit (penetration testing, OWASP Top 10)
  • Production deployment

Agent Assignments:

  • I-01: E2E Test Suite (90%+ coverage)
  • I-02: Performance Optimization (Lighthouse >90)
  • I-03: Mobile Responsiveness (5+ device sizes)
  • I-04: Accessibility Audit (WCAG 2.1 AA)
  • I-05: Offline Mode Testing (service workers)
  • I-06: Security Testing (SQL injection, XSS, CSRF)
  • I-07: WhatsApp Integration Testing (real notifications)
  • I-08: Home Assistant Camera Testing (real hardware)
  • I-09: Data Migration & Seeding (demo accounts)
  • I-10: Deployment & Monitoring (Docker, Grafana, Sentry)

Success Criteria:

  • 90%+ E2E test coverage
  • Zero critical security vulnerabilities
  • <3s page load time (3G connection)
  • Production deployment successful

Mission 4: Sonnet Planner/Coordinator

Duration: Concurrent with all missions (12-20 hours) Agent: 1 Sonnet 4.5 Budget: $4-$6

Responsibilities:

  1. Mission sequencing (1 → 2 → 3)
  2. Blocker resolution (<30 min average)
  3. Idle task management (keep agents productive)
  4. Quality assurance (IF.TTT compliance)
  5. Integration with ongoing InfraFabric S² expansion

Success Metrics:

  • <10% agent idle time
  • <30 min blocker resolution
  • 100% IF.TTT compliance
  • 90% quality score (tests, Lighthouse, security)


📊 Integration with Ongoing InfraFabric S²

InfraFabric Current State:

  • S² expansion: API reach growing (hosting, cloud, SIP, billing)
  • MCP bridge: 92% philosophy compliance (production-ready)
  • Multi-agent swarms: 20+ agents validated

NaviDocs Integration Points:

  1. Shared MCP Bridge - Same message bus for agent coordination
  2. IF.TTT Standards - Same audit trail patterns from bridge patches
  3. Swarm Patterns - Reuse InfraFabric coordination logic
  4. Git Workflow - Feature branch navidocs/s2-development, merge when complete

Coordination Protocol:

  • NaviDocs agents report to S2-PLANNER
  • S2-PLANNER reports progress to user
  • If InfraFabric agents need NaviDocs data, coordinate via MCP bridge
  • Parallel development: InfraFabric API expansion + NaviDocs dashboard

🎯 Success Criteria (100% Compliance)

From Session 1 (Market Research)

  • Solves €15K-€50K inventory loss (Inventory Tracking module)
  • Solves 80% remote monitoring anxiety (Camera Monitoring module)
  • Solves €5K-€100K/year maintenance chaos (Maintenance Log module)
  • Solves €60K-€100K/year expense nightmare (Expense Tracking module)
  • Solves €1K-€10K warranty penalties (Warranty Dashboard module)
  • Solves €20K-€100K VAT penalties (VAT Compliance module)

From Session 2 (Technical Architecture)

  • 29 database tables migrated
  • 50+ API endpoints implemented
  • Multi-tenant isolation enforced
  • Home Assistant integration (RTSP/ONVIF cameras)
  • WhatsApp Business API integration
  • Meilisearch faceted search
  • Multi-calendar system (4 calendars)
  • Document versioning (IF.TTT compliance)

From Session 3 (UX/Sales)

  • Design system applied (Ocean Deep, Wave Blue, Sand Beige)
  • Mobile-first responsive (80% of users)
  • Keyboard shortcuts (Ctrl+1-8 navigation)
  • Accessibility (WCAG 2.1 AA)
  • ROI calculator (€24K-€65K value recovery)
  • 19-25 hour time savings per transaction
  • 98% documentation completeness vs 60-70% industry average

From Session 4 (Implementation Planning)

  • 4-week implementation timeline (Nov 13 - Dec 10, 2025)
  • 162 hours estimated work (matches S² swarm timeline)
  • Foundation → Integrations → Automation → Polish workflow

From Session 5 (Guardian Validation)

  • IF.TTT compliance (Traceable, Transparent, Trustworthy)
  • All claims verified with citations
  • Quality assurance metrics (tests, performance, security)

💰 Budget Breakdown

Mission Agents Model Estimated Tokens Cost
Mission 1 (Backend) 10 Haiku 600K $3-$5
Mission 2 (Frontend) 10 Haiku 600K $3-$5
Mission 3 (Integration) 10 Haiku 600K $2-$3
Mission 4 (Planner) 1 Sonnet 200K $4-$6
TOTAL 31 Mixed 2M $12-$18

Comparison to Original Budget:

  • Original (Session 1-5 cloud sessions): $90
  • S² Development: $12-$18
  • Savings: $72-$78 (80-87% reduction)

Why cheaper:

  • Haiku agents (not Sonnet) for mechanical work
  • Parallel execution (reduce wall-clock time)
  • Reuse InfraFabric swarm patterns (no research needed)
  • Backend/Frontend/Integration clear separation (no overlap)

📅 Timeline & Milestones

Week 1: Backend Development (Mission 1)

  • Day 1-2: Database migrations + API scaffolding
  • Day 3-4: Business logic implementation
  • Day 5: Integration testing + bug fixes
  • Milestone: All 50+ APIs functional

Week 2: Frontend Development (Mission 2)

  • Day 6-7: Dashboard layout + navigation
  • Day 8-9: Feature modules (Cameras, Inventory, Maintenance, Expenses)
  • Day 10: Remaining modules (Contacts, Search, Warranty, VAT, WhatsApp)
  • Milestone: All 8 dashboard modules complete

Week 3: Integration & Testing (Mission 3)

  • Day 11-12: E2E testing + performance optimization
  • Day 13: Mobile responsiveness + accessibility audit
  • Day 14: Security testing + bug fixes
  • Milestone: Production-ready deployment

Week 4: Launch & Pilot (Riviera Plaisance)

  • Day 15-16: Staging deployment + final testing
  • Day 17: Production deployment
  • Day 18-21: Pilot with Riviera Plaisance (3 boats)
  • Milestone: Live pilot running

Target Launch Date: December 10, 2025


🚀 Deployment Strategy

Staging Environment:

Production Environment:

  • URL: https://app.navidocs.example.com
  • Database: Production PostgreSQL (multi-tenant)
  • Monitoring: Grafana + Prometheus + Sentry
  • Backup: Daily automated backups (30-day retention)
  • Deployment: Docker Compose (or Kubernetes if scaling needed)

Rollback Plan:

  • Git tag each deployment (v1.0.0, v1.0.1, etc.)
  • Database migration rollback scripts
  • Blue-green deployment (zero downtime)

📈 Post-Launch Metrics

Track These Metrics:

  1. User Engagement - Daily active users (DAU), weekly active (WAU)
  2. Feature Adoption - Which modules used most (Camera? Inventory? Expenses?)
  3. Performance - API latency (p50, p95, p99), page load time
  4. Errors - Error rate (target: <1%), crash-free sessions (target: >99%)
  5. Business Impact - €15K-€50K inventory value recovery (average per boat)

Success Indicators:

  • 80%+ boat owners use Camera Monitoring daily ("is my boat OK?")
  • 90%+ boat owners add inventory within first week
  • 50%+ boat owners set up WhatsApp notifications
  • <3s average page load time (even on 3G)
  • Zero critical bugs in first month

🔗 GitHub Repository Structure

navidocs/
├── .github/
│   └── workflows/
│       └── ci.yml (run tests on every commit)
├── client/ (Frontend)
│   ├── src/
│   │   ├── pages/
│   │   │   └── OwnerDashboard.vue
│   │   ├── components/ (10 feature modules)
│   │   └── tests/
│   └── .storybook/
├── server/ (Backend)
│   ├── routes/ (10 API route files)
│   ├── db/
│   │   └── migrations/ (5 migration files)
│   └── tests/
├── intelligence/ (Research from Sessions 1-5)
│   ├── session-1/ (Market research)
│   ├── session-2/ (Technical architecture)
│   ├── session-3/ (UX/Sales)
│   ├── session-4/ (Implementation plan)
│   ├── session-5/ (Guardian validation)
│   └── s2-backend/ (S² Backend swarm outputs)
│   └── s2-frontend/ (S² Frontend swarm outputs)
│   └── s2-integration/ (S² Integration swarm outputs)
├── S2_MISSION_1_BACKEND_SWARM.md (This session)
├── S2_MISSION_2_FRONTEND_SWARM.md (This session)
├── S2_MISSION_3_INTEGRATION_SWARM.md (This session)
├── S2_MISSION_4_SONNET_PLANNER.md (This session)
├── NAVIDOCS_S2_DEVELOPMENT_ROADMAP.md (This document)
└── NAVIDOCS_COMPLETE_INTELLIGENCE_DOSSIER.md (Sessions 1-5 summary)

Validation Checklist

Before Starting Mission 1:

  • InfraFabric S² coordination framework reviewed
  • MCP bridge patterns understood (IF.TTT compliance)
  • Session 2 architecture spec accessible (GitHub URL)
  • All 31 agents understand their tasks (check-in protocol)
  • S2-PLANNER ready to spawn agents

After Mission 1 (Backend):

  • All 50+ APIs functional (Postman collection tested)
  • Database migrations applied successfully
  • Multi-tenant isolation verified (no data leakage)
  • OpenAPI 3.0 spec complete
  • Unit + integration tests passing

After Mission 2 (Frontend):

  • All 8 dashboard modules visible
  • Design system 100% compliant (Ocean Deep, Wave Blue, Sand Beige)
  • Mobile-first responsive (5+ devices tested)
  • Keyboard shortcuts functional (Ctrl+1-8)
  • Lighthouse score >90

After Mission 3 (Integration):

  • E2E test suite passing (90%+ coverage)
  • Security audit complete (zero critical vulnerabilities)
  • Performance optimized (<3s page load)
  • Accessibility audit passed (WCAG 2.1 AA)
  • Production deployment successful

🎯 Next Steps

  1. Read this roadmap - Ensure all features understood
  2. Review Mission 1 file - S2_MISSION_1_BACKEND_SWARM.md
  3. Spawn S2-PLANNER - Sonnet agent to coordinate all missions
  4. Launch Mission 1 - Backend swarm (10 Haiku agents)
  5. Monitor progress - S2-PLANNER tracks agent status via MCP bridge
  6. Proceed to Mission 2 - When Backend complete
  7. Proceed to Mission 3 - When Frontend complete
  8. Deploy to production - December 10, 2025 target

Generated: 2025-11-14 By: Claude Sonnet 4.5 (InfraFabric S² coordination framework) Citation: if://roadmap/navidocs-s2-development-2025-11-14 Status: READY TO LAUNCH