ggq-admin
|
eaf9fae275
|
docs: Add complete NaviDocs handover documentation and StackCP analysis
This commit finalizes the NaviDocs MVP documentation with comprehensive handover materials.
## Documentation Added:
1. **NAVIDOCS_HANDOVER.md** - Complete project handover (65% MVP complete)
- Executive summary and current status
- Repository structure and component details
- Testing results and known issues
- Deployment options (StackCP vs VPS)
- Next steps and risk assessment
- Success metrics and recommendations
2. **StackCP Analysis Documents**:
- ANALYSIS_INDEX.md - Master overview
- STACKCP_ARCHITECTURE_ANALYSIS.md - Technical deep-dive
- STACKCP_DEBATE_BRIEF.md - Deployment decision framework
- STACKCP_QUICK_REFERENCE.md - Fast decision-making tool
## Current State Summary:
**Completed** (65% MVP):
- ✅ Database schema (13 tables, fully normalized)
- ✅ OCR pipeline (3 options: Tesseract 85%, Google Drive, Google Vision)
- ✅ Upload endpoint with background processing
- ✅ StackCP deployment fully evaluated
- ✅ Local development environment operational
**Pending** (35% to MVP):
- ⚠️ Meilisearch authentication (15-min fix)
- ⚠️ Frontend UI incomplete (1-2 days)
- ⚠️ Authentication not implemented (1 day)
- ⚠️ Tests needed (2-3 days)
## Deployment Options:
**StackCP Shared Hosting**: /bin/bash infrastructure, suitable for <5K docs/month
**VPS Alternative**: /month, better for scale
## Key Findings:
- Upload + OCR pipeline: ✅ Working (85% confidence)
- Database: 184KB with test data
- Services: Redis ✅, Meilisearch ⚠️ (auth issue), API ✅, Worker ✅
- Git: 18 commits, all code committed
Ready for: Development continuation, deployment preparation
Not ready for: Production (needs auth + testing)
🚀 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude <noreply@anthropic.com>
|
2025-10-19 13:19:42 +02:00 |
|